Alabama Power purchased the Calhoun Natural Gas Facility in order to help improve its grid reliability. “The Calhoun facility, located in Eastaboga, Alabama, includes four simple cycle combustion turbine units that can operate on either gas or oil, having onsite oil storage as a backup fuel source. Constructed in 2003-2004, the units have a combined maximum generation capacity of 743 MW.”
The DOE Announces $1 Billion Plan for Improving Power Systems to Rural Areas
By T&D World:
The US Department of Energy (DOE) is seeking information (RFIs) from rural areas in order to improve power generation to rural and remote users. DOE will spend $1 Billion for this plan to enhance the power grid by strengthening the power “resilience, reliability, and availability of energy systems, while simultaneously helping communities unlock the public health and cost-saving benefits to cleaner, and more efficient energy providers.”
Dominion Energy Proposes New Solar and Energy Storage Projects in Virginia
“Dominion Energy has proposed nearly two dozen new solar and energy storage projects, according to new filings with Virginia regulators. If approved by the Virginia State Corporation Commission (SCC), the projects will provide more than 800 MW of electricity.
Ten solar and storage projects totaling nearly 500 MW would be directly owned and operated by Dominion. The proposal also includes PPAs with 13 solar and storage projects, totaling more than 300 MW.
Construction of the projects is projected to support nearly 4,800 clean energy jobs and will generate more than $920 million in economic benefits across Virginia.”
The Importance of Electrical Construction Permit Inspections
THE PERMIT AND INSPECTION PROCESS IS ESSENTIAL TO ENSURE THAT CODES, REGULATIONS, AND SAFETY ARE ENFORCED TO HELP PREVENT FAULTY OR POOR INSTALLATIONS THAT COULD JEOPARDIZE HUMAN LIFE. IN MOST CASES, ENGINEERING BLUEPRINT DRAWINGS ARE REQUIRED TO BE SUBMITTED ALONG WITH THE PERMIT REQUEST WHICH MUST BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER (PE). OTHER PERMITS WITH SEALED DRAWING PLANS ARE REQUIRED FOR EACH DISCIPLINE, SUCH AS, ARCHITECTURAL, CIVIL, ELECTRICAL, FIRE PROTECTION, MECHANICAL, PLUMBING, STRUCTURAL, ETC.
Canada OPG and Czech Republic Partner to Advance Small Modular Reactors
By PowerMag: “Ontario Power Generation (OPG) and Czech Republic-based ČEZ are collaborating to advance deployment of nuclear technology, including small modular reactors (SMRs). The companies said they signed a memorandum of understanding (MOU) on Oct. 11, with an aim to “reduce financial, technical and schedule risk to both parties on their respective future projects.”
“OPG is Ontario’s largest electricity generator. The company has 75 generating stations in the province with a combined capacity of more than 18 GW. In addition to 66 hydroelectric facilities, its fleet includes two nuclear stations—the 3.5-GW Darlington facility and the 3.1-GW Pickering station (Figure 1). OPG says nuclear power provides about 60% of Ontario’s power today.”
AES Increases Its Battery Energy Storage by an Additional 908 Megawatt-hours in California
By Renewable Energy World: AES confirmed two new future battery storage sites in Lancaster CA for a total of 227 MW / 908 MWh capacity. “The two facilities are expected to provide a boost to California’s grid, storing renewable energy to be dispatched during periods of high demand.”
AES is awarding contracts for both Clean Power Alliance and PG&E for purchasing the renewable energy from its Luna and Lancaster (LAB) facilities. “In its own announcement, Fluence said the LAB system will use its Mosaic platform for intelligent bidding in the state’s wholesale market, operated by CAISO. Mosaic will “integrate directly with Gridstack, processing operating constraints and parameters in real-time, and employ advanced machine learning and artificial intelligence to generate bids that maximize LAB’s market earnings.”